European Project Semester at ISEP - EPS@ISEP

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
plan [2012/04/14 23:58] team2plan [2012/04/17 11:43] (current) team2
Line 18: Line 18:
 |The electric part of the system         | Sander |      |The electric part of the system         | Sander |     
 |Selection of chemical and biological methods         | Joanna | |Selection of chemical and biological methods         | Joanna |
-|Search components and materials on the Internet        | Joanna, Aleksandra and Sander +|Search components and materials       | Joanna, Aleksandra and Sander |
-|Search for providers and materials in stores   | Aleksandra|+
 |The final choice of materials in stores    | Aleksandra and Joanna | |The final choice of materials in stores    | Aleksandra and Joanna |
 |Interim Report   | Adam, Aleksandra, Sander and Joanna | |Interim Report   | Adam, Aleksandra, Sander and Joanna |
 |Marketing plan        | Adam|   |Marketing plan        | Adam|  
 |Ecological Footprint and Sustainibility    | Adam | |Ecological Footprint and Sustainibility    | Adam |
-|Presentation   |Joanna +|Mid-term presentation   |Joanna | 
-|Final report  | Adam +|Build the system  |Aleksandra and Sander 
-|Build the system  |+|Final tests   Joanna 
-|Final tests   +|Final report  | Adam, Aleksandra, Joanna and Sander | 
-|Final report  | Adam | +|Final presentation  | Adam | 
-|Video, Paper and Poster|?|+|Video, Paper and Poster|Sander|
  
 ===== Gantt Chart ===== ===== Gantt Chart =====
 {{http://sander.planet.ee/porto/gantt.png}} {{http://sander.planet.ee/porto/gantt.png}}
QR Code
QR Code plan (generated for current page)