European Project Semester at ISEP - EPS@ISEP

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
plan [2012/04/10 18:41] team2plan [2012/04/17 11:43] (current) team2
Line 15: Line 15:
  
 ^ Task      ^ Responsible    ^ ^ Task      ^ Responsible    ^
-|The mechanical part of the system        | Aleksandra |  +|The mechanical part of the system        | Aleksandra |
 |The electric part of the system         | Sander |      |The electric part of the system         | Sander |     
-|Selection of chemical and biological methods         | Joanna |   +|Selection of chemical and biological methods         | Joanna | 
-|Marketing plan - mainly responsible         | Adam|   +|Search components and materials       | Joanna, Aleksandra and Sander | 
-|"Competitors" and SWOT part of marketing plan      |Joanna  |    +|The final choice of materials in stores    | Aleksandra and Joanna | 
-|Evaluating marketing objectives part of marketing plan       | Sander| +|Interim Report   | Adam, Aleksandra, Sander and Joanna | 
-|Search components and materials on the Internet        | Joanna, Aleksandra and Sander | +|Marketing plan        | Adam|   
-|The mechanical part of the system        Aleksandra +|Ecological Footprint and Sustainibility    Adam | 
 +|Mid-term presentation   |Joanna | 
 +|Build the system  |Aleksandra and Sander | 
 +|Final tests   | Joanna 
 +|Final report  | Adam, Aleksandra, Joanna and Sander | 
 +|Final presentation  Adam | 
 +|Video, Paper and Poster|Sander| 
 ===== Gantt Chart ===== ===== Gantt Chart =====
 {{http://sander.planet.ee/porto/gantt.png}} {{http://sander.planet.ee/porto/gantt.png}}
QR Code
QR Code plan (generated for current page)