European Project Semester at ISEP - EPS@ISEP

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
plan [2012/03/12 17:50] – [Gantt Chart] team2plan [2012/04/17 11:43] (current) team2
Line 15: Line 15:
  
 ^ Task      ^ Responsible    ^ ^ Task      ^ Responsible    ^
-A         X and Y   +|The mechanical part of the system        Aleksandra 
-        | |      +|The electric part of the system         | Sander |      
-        | Wand   +|Selection of chemical and biological methods         | Joanna | 
-D         W  +|Search components and materials       | JoannaAleksandra and Sander 
-E         WXand |    +|The final choice of materials in stores    Aleksandra and Joanna 
-F         X+|Interim Report   AdamAleksandraSander and Joanna | 
-G         and |+|Marketing plan        | Adam|   
 +|Ecological Footprint and Sustainibility    | Adam | 
 +|Mid-term presentation   |Joanna | 
 +|Build the system  |Aleksandra and Sander 
 +|Final tests   Joanna | 
 +|Final report  | Adam, Aleksandra, Joanna and Sander | 
 +|Final presentation  | Adam | 
 +|Video, Paper and Poster|Sander|
  
 ===== Gantt Chart ===== ===== Gantt Chart =====
-[[http://sander.planet.ee/porto/Screen%20Shot%202012-03-12%20at%2017.47.17.png?2]]+{{http://sander.planet.ee/porto/gantt.png}}
QR Code
QR Code plan (generated for current page)